Where Schools Commonly Misunderstand the Difference Between General Awareness and Site Specific Information

A contractor may hold valid asbestos awareness training, but that is not the same as being told where asbestos is known or presumed to be on a particular school site. Contractor asbestos awareness school site arrangements need both elements. General training helps the contractor recognise risk and understand safe behaviour. Site specific information tells them where the actual restrictions are.

This distinction matters. A trained electrician can still drill into asbestos insulating board if they have not seen the relevant plan, room notes, or restrictions for that school. Equally, a hirer can be told that the building contains asbestos in general terms, but unless the school explains no drill areas, storage restrictions, and the escalation route for defects, the warning may be too vague to be useful.

Article Contents

Why This Article Defers Wider Responsibility Questions to Asbestos Legal Duties Schools

The wider question of who is legally the dutyholder, how responsibility is allocated between trusts, governing bodies, local authorities, and employers, and how the regulations apply across different school structures is covered more fully elsewhere in the cluster. For that broader legal framework, readers should refer to the article on asbestos legal duties schools.

This article stays focused on managing contractors asbestos schools in operational terms: what information to share, when to share it, how to record it, and how to stop third party access becoming the weak point in the school’s asbestos arrangements.

Further guidance can be found in the asbestos licensing requirements.

What Information Contractors and Tenants Need Before They Arrive

Providing Relevant Parts of the Asbestos Register

Contractors do not always need the entire register, but they do need the relevant parts before starting work. The asbestos register for contractors in schools should identify the areas they will access, the materials known or presumed to contain asbestos, their condition, and any restrictions. If a contractor may move outside a tightly defined work area, the information should match that wider scope.

For example, a boiler engineer attending a plant room may need details for the access route, the plant space, adjacent risers, and any known debris issues, not just the specific item of equipment being serviced. A contractor carrying out classroom cabling may need information for the classroom, ceiling voids, trunking routes, and nearby store rooms.

Giving Access to the Management Plan Without Overloading Occasional Users

The asbestos management plan contractors schools process should be proportionate. A principal contractor delivering substantial works may need fuller access to relevant procedures, emergency steps, authorisation controls, and escalation routes. An occasional hall hirer is unlikely to need the full plan, but they may need a controlled summary covering room restrictions, prohibited activities, and who to contact if building damage or suspect materials are seen.

The mistake is at either extreme. Giving nothing is unsafe. Giving every occasional user a large uncontrolled document can also be ineffective if the practical restrictions are buried in detail. The better approach is to issue a site specific extract or concise briefing that reflects what the user will actually do.

Explaining Known Locations, Restrictions, Presumed Materials, and No Drill Areas

What should contractors know about asbestos in schools before arrival? At a minimum, they should know where they are allowed to work, where they are not allowed to disturb surfaces, what materials are known or presumed to contain asbestos, which hidden spaces require approval before access, and what to do if their planned task changes.

Schools should also explain local restrictions clearly. Typical examples include no drilling in identified partitions, no access to ceiling voids without authorisation, no lifting floor coverings, no penetration of boxing or risers, no disturbance of old wall panels, and no use of fixings in specified areas. If known asbestos is in good condition and will not be disturbed, that should still be stated so contractors do not make unsafe assumptions.

Recording That Information Has Been Received and Understood

Information sharing should be evidenced. That can be done by pre start acknowledgement, digital confirmation, induction sign off, permit issue, or contractor signature against the relevant asbestos briefing. For hirers, a booking declaration and acceptance of site rules may be appropriate, provided the wording is specific enough to be meaningful.

Managing contractors asbestos schools becomes difficult to defend after an incident if there is no record of what was shared, with whom, and when. A signed line on a generic visitor sheet is weak evidence if it does not identify the information actually issued.

Managing Contractors Asbestos Schools – How To Control Access To The Asbestos Register And Management Plan

How to Control Access to the Asbestos Register and Management Plan

When Full Documents Are Appropriate and When a Site Specific Extract Is Better

Some contractors need broad visibility because they are planning multi area works, coordinating subcontractors, or taking responsibility for sequencing intrusive tasks. Others only need a controlled extract relevant to a room, route, or activity. The decision should be based on scope, not convenience.

Where there are safeguarding, security, or sensitive building information concerns, schools may prefer not to circulate full estate documents widely. That can be reasonable, provided the school still shares everything necessary for safe work. A site specific extract is often better for one off visitors because it is clearer and easier to use on site.

Using Sign in Systems, Contractor Packs, and Digital Access Logs

Many schools now use digital contractor portals or sign in systems. These can work well if they require pre reading of asbestos information, capture acknowledgements, and link the contractor to the approved scope of work. A contractor pack can include plans, room restrictions, induction points, permit conditions, and emergency contacts.

Digital access logs are useful because they create an audit trail showing who was given which version of the information. That matters if the register changes following a new survey, remedial work, or an updated presumption. If the school relies on paper copies, version control becomes especially important.

Keeping Sensitive Building Information Controlled While Still Sharing What Is Necessary

Some schools are uneasy about providing building plans to external users. That is understandable, but the answer is controlled disclosure rather than withholding critical information. If a contractor needs to know that a riser contains asbestos insulating board, that information must be communicated in a usable way. If a hirer must not fix equipment to particular walls, that restriction needs to be explicit.

Managing contractors asbestos schools is about giving relevant information to the right people, not publishing the whole estate file indiscriminately. Redacted plans, room specific extracts, supervised review, and time limited digital access can all help strike that balance.

Linking Back to Asbestos Management Plan Schools for Document Structure and Review Cycles

The detailed structure, maintenance, and review cycle of the management plan sits outside the scope of this article. Schools reviewing how asbestos information is organised should refer to the related article on asbestos management plan schools. That is the right place to consider document ownership, updates, monitoring, and periodic review.

Here, the operational point is simpler: whatever format the documents take, they need to support managing contractors asbestos schools in real time, including out of hours access, holiday works, and short notice attendance.

Contractor Induction for Asbestos Safety in a School Environment

What a Practical Asbestos Induction Should Cover on Arrival

A school asbestos contractor induction should be short enough to use consistently and detailed enough to prevent unsafe assumptions. It should confirm the scope of work, authorised areas, restricted areas, known or presumed asbestos relevant to the task, no drill or no access zones, permit requirements, emergency stop arrangements, and the reporting route for defects or unexpected findings.

It should also confirm practical basics: who is escorting the contractor if required, what to do if the job changes, where updated plans are held, whether photographs are allowed, and whether any school activities nearby affect the method of work. If the contractor has subcontractors, the school should be clear about who is responsible for briefing them.

How to Address Ceiling Voids, Service Risers, Store Rooms, Plant Areas, and Out of Hours Access

These are the spaces where assumptions often cause trouble. Ceiling voids can contain debris, old insulation residues, hidden boards, and service routes passing through multiple rooms. Risers and ducts may contain lagging, asbestos insulating board, or old packing materials. Store rooms and plant areas are often poorly controlled because they are out of sight and used irregularly.

The induction should therefore deal expressly with these spaces. If access is prohibited without further approval, say so. If a void can only be opened in the presence of the site team, say so. If out of hours access is permitted, explain how the contractor will obtain current asbestos information when normal office staff are not present. Managing contractors asbestos schools often fails during evenings and holiday periods when normal supervision is reduced.

Tailoring Inductions for Short Term Visits, Repeat Contractors, and Project Based Works

Not every visitor needs the same level of induction. A courier does not need an asbestos briefing. A service engineer entering a plant room does. A repeat contractor may need a shortened refresh, but only if the school is satisfied that the scope, location, and information remain unchanged. For project works, the induction should be more detailed and linked to permits, RAMS review, sequencing, and change control.

Repeat attendance is a known risk area. Schools often assume regular contractors already know the site, but buildings change, registers are updated, and familiar people can become less cautious over time. A proportionate refresh is usually safer than relying on memory.

Who Should Deliver the Induction and How Often It Should Be Refreshed

The induction should be delivered by someone who understands both the school’s asbestos information and the practical scope of the visit. That may be the facilities manager, site manager, premises officer, or another competent person with access to the current register and management arrangements.

Refresh frequency depends on risk, change, and repeat attendance. If there is a material change to the register, the work area, or the task, the induction should be repeated. For periodic contractors, annual review may be reasonable for baseline arrangements, but high risk or intrusive tasks should still be briefed each time. The key is that school asbestos contractor induction is live and task based, not treated as a one off formality.

Checking Competence, Training, and Safe Systems of Work

What Schools Should Ask for Before Appointing External Contractors

Before appointment, schools should ask for evidence of competence relevant to the proposed work. That may include trade qualifications, insurance, references, asbestos awareness training where appropriate, previous experience in occupied or sensitive premises, and the ability to produce suitable risk assessments and method statements.

Where works are more intrusive, the school should also look at how the contractor plans to verify asbestos information before disturbing the fabric, how they control scope change, and how they supervise subcontractors. Managing contractors asbestos schools is as much about behavioural control as paperwork; a contractor who dismisses the issue or treats older buildings casually is a warning sign.

Evidence of Asbestos Awareness Training and Why It Is Not Enough on Its Own

Contractor asbestos awareness school site competence matters, but awareness training alone does not authorise anyone to disturb asbestos, nor does it replace proper planning. It simply shows that the person should recognise asbestos risk, understand the consequences of disturbance, and know the need to avoid work that could expose them or others.

Schools should ask what the training covered, when it was completed, and whether it is appropriate to the role. They should also test whether the contractor understands the difference between general awareness and site specific restrictions. A contractor who says training means they do not need to see the register has misunderstood the purpose entirely.

Reviewing Risk Assessments, Method Statements, and Permit to Work Controls

RAMS should be checked against the actual building and the asbestos information provided. Generic documents that mention asbestos only in passing are a common weakness. If the method says drilling will be undertaken “as required” but the school has identified no drill zones, the contradiction needs resolving before work begins.

Permit to work asbestos schools arrangements are especially useful for tasks involving penetrations, access to hidden voids, plant spaces, or changes to the agreed method. The permit should confirm the approved scope, location, restrictions, authorisations, and stop work triggers. It should not be issued automatically as part of sign in.

When a Licensed Asbestos Contractor or Specialist Consultant Should Be Brought In

If the planned work may disturb known or presumed asbestos, the school should stop and obtain competent advice. Depending on the material and task, that may require a licensed asbestos contractor or a specialist consultant. It is also sensible to seek advice where information is unclear, plans are outdated, previous works have altered the area, or debris is suspected.

Specialist support is not only for removal. Schools often need consultancy input to review contractor controls, interpret survey findings, update communication packs, or assess whether proposed works can proceed safely. That is a key part of managing contractors asbestos schools when the estate is complex or documentation has evolved over time.

Managing Low Intrusion Work That Can Still Disturb Asbestos

Why Cabling, Alarm Fitting, Display Fixing, and Minor Repairs Need Controls

Low intrusion work is where many schools are caught out because the activity looks routine. Cabling routes can pass through asbestos containing panels or voids. Alarm devices may require drilling into soffits, columns, or wall boards. Display fixing can disturb textured coatings, partition linings, or backing boards. Minor repairs can reveal older materials hidden behind modern finishes.

Managing contractors asbestos schools means treating these jobs as controlled activities, not informal maintenance tasks. If the task changes the fabric in any way, the asbestos information has to be checked first.

How to Challenge Informal Requests to Drill, Screw, Cut, Lift, or Access Hidden Voids

School staff often face pressure to helpfully approve small changes on the spot. A contractor asks to put “just two screws” into a wall, lift “one tile” to trace a cable, or open “a quick access panel” to inspect a service. Those are exactly the requests that should trigger a pause.

The safe response is procedural rather than personal. No drilling, cutting, lifting, penetration, or void access should take place until the relevant asbestos information is checked and, where required, the permit or authorisation is updated. This protects both the school and the contractor.

Practical Examples of Work That Should Stop Until Asbestos Information Is Checked

Examples include fitting a new interactive screen to an older classroom wall, adding trunking in a corridor, replacing a damaged door closer where the frame substrate is unknown, lifting vinyl flooring to inspect moisture, opening a boxed pipe run to find a leak, removing old shelving fixed to partition boards, and installing CCTV through an external soffit.

In each case, the work may look simple, but the hidden substrate is what matters. Managing contractors asbestos schools requires staff to recognise these trigger points and stop work until the register, survey information, and restrictions have been reviewed.

Managing Community Tenants, Lettings, and Shared Occupation

What After School Clubs, Religious Groups, Sports Providers, and Community Users Need to Know

After school club asbestos responsibilities are often overlooked because these users are seen as occupiers rather than contractors. In reality, they can create risk through room setup, storage, decoration, temporary fixtures, and works arranged independently. They need to know what areas they may use, what they must not disturb, what defects to report, and that they cannot authorise any works to the fabric without the school’s approval.

School lettings asbestos information should therefore cover practical restrictions, not just a broad statement that asbestos may be present somewhere in the building. If a hall is hired, the hirer should know whether fixings, banners, cables, storage alterations, or equipment installation are prohibited. If a nursery or long term user occupies a dedicated area, the briefing will need to be more detailed.

Setting Clear Boundaries for Room Use, Storage, Temporary Fixtures, and Equipment Installation

Problems commonly arise when hirers start using adjacent cupboards, moving furniture into plant spaces, taping or screwing temporary fittings to walls, or bringing in their own maintenance people. Clear boundaries should be written into site rules and reinforced at induction or handover.

That means defining approved rooms, storage limits, access restrictions, what counts as an alteration, and who must approve any request involving fixtures, cables, signage, or installations. Managing contractors asbestos schools overlaps with lettings control here because third party occupation often leads to third party works.

Including Asbestos Controls in Hire Agreements, Lettings Terms, and Site Rules

Hire agreements should make it clear that users must not disturb the fabric, must not bring in contractors without authorisation, must report defects or accidental damage immediately, and must follow site asbestos instructions. For regular users, a separate asbestos information sheet may be appropriate, with signed acknowledgement.

This is particularly important where the school has an active lettings programme. If the bookings team can approve hires without reference to site safety controls, the school risks creating a gap between commercial use of the premises and the asbestos management system.

Handling Shared Responsibility in Premises Used by More Than One Organisation

Shared premises asbestos responsibilities schools arrangements can become blurred when one organisation controls the building and another controls day to day use of part of it. A nursery, faith organisation, leisure operator, or community trust may occupy defined space but still rely on the school’s building information and rules.

The practical answer is not to assume someone else is dealing with it. Responsibilities for information sharing, reporting defects, approving alterations, appointing contractors, and emergency escalation should be set out clearly in writing and reflected in actual day to day practice.

Who Is Responsible in Shared Spaces and Multi User Arrangements

How Control of Premises Affects Practical Responsibility Day to Day

Practical responsibility often follows control of the premises, but in shared occupation the picture can be mixed. One party may control the building fabric while another manages staff, activities, and local contractors within a leased or licensed area. That makes handover arrangements critical.

For managing contractors asbestos schools, the question is not only who holds the duty in legal terms, but who is actually authorising access, reviewing works, issuing information, and stopping unsafe activity on the day. If those actions are not assigned clearly, risk sits in the gaps.

Why Schools Still Need Clear Handover, Supervision, and Escalation Arrangements

Even where another organisation occupies part of the site, schools still need clear routes for handover and escalation. If a tenant spots damage to an asbestos containing material, they must know who to call. If they want to install equipment, they must know who approves that request. If their contractor arrives on site, someone needs to confirm asbestos information has been checked.

Shared premises asbestos responsibilities schools issues are manageable when they are translated into clear operating rules. They become dangerous when everyone assumes the other party is supervising the detail.

Examples from Leisure Blocks, Nursery Lets, Community Wings, and Faith Based Shared Sites

A leisure block used by the school in the day and by a community operator in the evening may have shared plant, changing rooms, and service corridors. A nursery let may occupy classrooms and outdoor stores but rely on the school for building maintenance. A faith based shared site may have separate governance but common halls, kitchens, or access routes.

In each case, managing contractors asbestos schools means mapping who can authorise works, who provides the asbestos register for contractors in schools or equivalent extracts, who carries out the school asbestos contractor induction, and who has authority to stop work if something is unclear.

Managing Contractors Asbestos Schools – What To Do If A Contractor Or Tenant Finds Suspected Asbestos

What to Do if a Contractor or Tenant Finds Suspected Asbestos

Stopping Work, Securing the Area, and Preventing Further Disturbance

If suspected asbestos discovered by contractor at school occurs, the first step is to stop work immediately. The area should be made safe, access restricted, and further disturbance prevented. Materials should not be touched, sampled, swept, or cleaned by untrained persons. Equipment should be left in place if moving it would disturb debris.

This response needs to be simple enough that contractors and hirers can follow it under pressure. Managing contractors asbestos schools is partly about preparing people for this moment before it happens.

Who to Notify Internally and Externally

The contractor or tenant should notify the nominated school contact without delay, usually the site manager, facilities manager, responsible person, or other named escalation lead. Depending on the circumstances, the school may then need input from an asbestos consultant, analyst, or licensed contractor. Internal reporting should also include anyone responsible for building safety, occupier protection, and incident management.

The key point is that reassurance should not be improvised by the nearest available person. If the material is unknown, it must be assessed properly before work restarts or the area is returned to normal use.

How This Connects to Emergency Asbestos School Procedures

The immediate response procedures after a suspected disturbance are covered in more detail in the related article on emergency asbestos school procedures. That article deals with containment, isolation, communication, and the next technical steps after potential fibre release or damage.

Here, the contractor management point is that third parties must know the trigger for stopping work and exactly how to escalate concerns. A procedure that exists only in the management plan but has not been briefed to contractors or hirers is unlikely to work in practice.

Why Reassurance Without Verification Creates Further Risk

One of the most common mistakes after a concern is raised is for someone to say the material is “probably fine” or “not the asbestos one” without checking current records or obtaining competent advice. That can lead to further disturbance, contaminated access routes, and much harder incident management later.

Managing contractors asbestos schools properly means building a culture where stopping work is treated as the correct response, not as inconvenience or overreaction.

Documentation That Protects the School if Decisions Are Questioned Later

Induction Records, Access Logs, Acknowledgements, and Permit Sign Off

If an incident is investigated, the school will need to show how information was controlled and communicated. Good records include induction logs, copies of issued extracts, digital acknowledgements, access records, permit sign off, and notes of any restrictions explained verbally on arrival.

These records are not just defensive paperwork. They also help the school identify patterns, such as repeat contractors working in multiple older blocks or frequent last minute job changes that increase risk.

Contract Clauses, Booking Forms, and Evidence of Information Sharing

Contract documents and hire agreements should support the practical controls. Useful wording includes obligations not to disturb the fabric without approval, requirements to review provided asbestos information, duties to report defects immediately, and confirmation that subcontractors are bound by the same rules.

Evidence matters. A booking system that stores accepted terms, issued site rules, and relevant asbestos information will leave the school in a much stronger position than a verbal arrangement managed through email fragments.

Audit Trails for Refusals, Work Stoppages, and Escalation Decisions

Schools should also keep records of decisions not to allow work, requests for more information, work stoppages, and escalation to specialists. These audit trails show that the school is actively managing risk rather than simply reacting after the fact.

For managing contractors asbestos schools, refusals are often as important as approvals. If a contractor wanted to drill in an area with unclear information and the school stopped the task pending review, that record demonstrates functioning control.

Common Failures That Lead to Preventable Disturbance

Relying on Verbal Warnings Alone

Verbal briefings are useful but fragile. People forget details, names change, and there is often no record of what was said. Where restrictions matter, they should be documented and acknowledged.

Using Outdated Registers or Poorly Marked Plans

An old register can be worse than none if it gives false confidence. Plans need to be current, legible, and matched to how rooms are actually identified on site. Renamed spaces, altered layouts, and historic survey references can all confuse contractors.

Assuming Regular Contractors Already Know the Site

Familiarity can reduce vigilance. Regular contractors may stop asking questions, and school staff may stop briefing them properly. Managing contractors asbestos schools needs repeat control, not reliance on habit.

Allowing Unsupervised Out of Hours Access

Out of hours work often bypasses the normal chain of checks. Keys are collected earlier, alarms are disabled, and no competent person is present to challenge scope change. If out of hours access is necessary, the information, permissions, and escalation route need to be watertight.

Separating Lettings Administration from Site Safety Controls

If the person approving lettings is not linked to the site safety process, community users can enter the building without any meaningful asbestos briefing. Commercial use of school space should never sit outside the safety control framework.

When External Consultancy Support Makes Sense

Schools with Ageing Estates, High Contractor Turnover, or Complex Shared Use

Some schools can manage routine contractor control internally. Others face a much harder picture: multiple older blocks, changing room uses, academies with decentralised administration, heavy holiday works, regular community occupation, or poor historic documentation. In those cases, external support can help turn a patchwork system into a workable one.

Managing contractors asbestos schools becomes more demanding where there is high contractor turnover or fragmented site control. Independent review can identify weak points before they lead to disturbance.

Reviewing Contractor Control Procedures Before Refurbishment or Holiday Works

Holiday periods often compress multiple works into a short window, sometimes with several trades on site at once. That is exactly when contractor communication, permit control, induction quality, and document version control need testing. A pre works review can be valuable before summer programmes, condition improvement works, reconfiguration projects, or major servicing campaigns.

Independent Advice on Registers, Inductions, Communication Packs, and Escalation Routes

Specialist consultancy can help schools review the asbestos register for contractors in schools, improve school asbestos contractor induction materials, align asbestos management plan contractors schools procedures with actual site access, and tighten the escalation route for suspected asbestos discovered by contractor at school situations.

That support is particularly useful where the school wants practical, defensible systems rather than broad policy statements. The aim is straightforward: make sure third party access is controlled, understood, and evidenced.

Schools that use external contractors, community hirers, and occasional tenants need a workable control system, not just a document on file. Specialist Remediation Solutions supports facilities managers, school business teams, and responsible persons with asbestos consultancy, contractor communication controls, document review, and practical site procedures. Use Contact us to talk through your current arrangements, or Get a quote for support with asbestos management, contractor controls, or project specific advice.

Leave a comment

Get a fast and free Quote Today!

If you're looking for a trusted and reliable solution to your remediation concerns, look no further than Specialist Remediation Solutions.

Click the link, fill in the form, and receive a personalised quote for your next project.

Get A Quote

Client Testimonials and Feedback

Specialist Remediation Solutions place picture
5.0
Based on 41 reviews
Stephen Dickey profile picture
Stephen Dickey
2 days ago
This is the second time I have used the service of Specialist Remediation Solutions to remove asbestos from my garden. The communication from the company is very good and their workforce are prompt and polite. Very much recommended.
A very professional outfit, all works completed to an excellent standard.
Cori profile picture
Cori
2 months ago
We were worried about having the work done as this was a part asbestos pipe in a state of deterioration. Booking was quick and easy, they came within days. We were reassured of the work being done, and they sealed the pipe (encapsulation) in a very short space of time. Friendly and approachable. Cleaned up thoroughly before leaving. Nice neat job, more than pleased with it. Thank you
John Sinclair profile picture
John Sinclair
3 months ago
Stephen was at our house within an hour after we made contact.assessed job honestly and gave great understanding and advice on what was required next day we received excellent quote and day of job .stephen matt and john arrived and in a safe and proffesional manner carried out task leaving everything clean and tidy on completion..brilliant job by a well organised brilliant company thanks again lads. Also great seeing you again stephen from school days over 40 years and you havent aged a minute bud😉
Matthew Carrington profile picture
Matthew Carrington
4 months ago
We had a great experience with these guys. They came in on short notice and did a very professional job of removing all the asbestos bitumen from the whole of the downstairs of our 1960s house.
Kirsty Becks profile picture
Kirsty Becks
5 months ago
Excellent service from start to finish. They removed all the asbestos ceilings throughout our house and did a fantastic job. The team was very prompt, professional, and efficient, keeping us informed throughout the process. They left everything clean and tidy when the work was completed. We’d highly recommend them to anyone needing asbestos removal work carried out.Thanks again!
Ria Kollar profile picture
Ria Kollar
6 months ago
We are very happy with the asbestos fascia board removal carried out by SRS at our garage site. They communicated throughout the project and stuck to the agreed timeline. We will not hesitate to use them again in the future.
Callum Taggas profile picture
Callum Taggas
6 months ago
Called up with last minute issue of some asbestos on a Boiler Install and attended next day 8am all works completed swiftly and clean. Couldn't recommend SRS enough. Thank you Guys
Susan Taylor profile picture
Susan Taylor
9 months ago
My experience with this company was excellent. They kept me up to date on everything , i spoke to them on more than 1 occasion and they was very friendly and helpful. I wouldnt hesitate to use them again if i ever needed to.
James Thompson profile picture
James Thompson
11 months ago
SRS removed and disposed of an asbestos flue from an old heating system and provided certification of testing show that there was no remaining asbestos. Very professional, clear communication and reason price. Highly recommended.
John Arquette profile picture
John Arquette
1 year ago
Great service. I have worked with Elena and Stephen on asbestos removals for several years now. They are always quick to respond to queries and carry out all work professionally and quickly.
stuart browse profile picture
stuart browse
1 year ago
What a great service for our charity. Swift, accurate, understanding and an easy to understand product. Thank you.
Natasha profile picture
Natasha
1 year ago
Quick and professional throughout. Our kitchen area was left in a clean and neat state once our ceiling had been removed. Very happy. Thank you
Helen Scarr profile picture
Helen Scarr
1 year ago
Great communication and price and a quick resolution. Highly recommend.
Isobel Kelly profile picture
Isobel Kelly
1 year ago
Very friendly and helpful put my mind at ease and discussed the whole process from start to finish would definitely recommend Specialist Remediation Solutions.
The Flower Hut profile picture
The Flower Hut
2 years ago
Great, efficient level of service & communication. Thank you for your help. Highly recommend.
Rebecca MILLS profile picture
Rebecca MILLS
2 years ago
SRS have completed work for my family twice now, both times in difficult circumstances for us. They are reliable and honest, completed the job very quickly and to a high standard. Whilst being professional they also show real empathy and care. I would highly recommend.
Jack Pandeli profile picture
Jack Pandeli
2 years ago
A very professional company that did a great job, I highly recommend SRS to anyone who wants to have asbestos removed
Hi everybody! My name JAOSIANY Marcello, I'm jobless but I'm florist and maneuver of house
Olumide Banjo profile picture
Olumide Banjo
2 years ago
April Lovell profile picture
April Lovell
2 years ago
Really brilliant service. Darrell, Andy and Matthew were all really helpful, polite and informative. They gave me their time when I had questions and all worked really hard. John and Elena were also really helpful. Would definitely recommend.
John Goodhind profile picture
John Goodhind
2 years ago
SRS did an excellent job removing my asbestos cement garage roof and an old asbestos boiler flue The workmen arrived promptly and did a super job leaving the property in a clean and tidy condition Altogether 5stars without question
Burundi is a country
Tresor Londisa profile picture
Tresor Londisa
2 years ago
It's really very interesting
Djekadom Patrick profile picture
Djekadom Patrick
2 years ago
Experiences 1- Student in technical sciences of information and communication in French 2- one year field internship 3- Photographer
Sunaina profile picture
Sunaina
2 years ago
Very efficient and easy to deal with,
Poppythedog 2010 profile picture
Poppythedog 2010
2 years ago
Great service, proffesional and competitive pricing. I would have no hesitation in recommending SRS. They removed to garage roofs that contained asbestos using all the correct PPE and supplied the appropriate waste and transfer paperwork to prove the ob was done properly. Thanks
Gus Wilmot profile picture
Gus Wilmot
3 years ago
Very prompt service, great value. We look forward to working with SRS again on our next project.
Ben Collett profile picture
Ben Collett
3 years ago
I completed a demolition and site clearance project where i had asbestos sheets on the floor and on a roof. I Contracted SRS to remove all asbestos which they completed efficiently and at a fair price. Even better still, we found some additional asbestos which we received same day service for the collection. Can't get any better than that! Great team and I highly recommend getting in touch for any asbestos removal needs you have.
Lloyd Smith profile picture
Lloyd Smith
3 years ago
From first contact (by email) to the guys leaving the site, a really impressive experience. Great communication, happy with the quote and all of the associated paperwork required. All health and safety for all involved carried out with professionalism. Work carried out within timespan given and site left clean and ready for next part of the project. An overall excellent experience and would be happy to recommend and use again.
john knight profile picture
john knight
3 years ago
Very thorough at consultancy stage. Polite and knowledgeable. Work carried out on time and very satisfied with the result. Would thoroughly recommend.
Paul Geoghegan profile picture
Paul Geoghegan
3 years ago
They do exactly what they say! Brilliant. Definitely recommend them. Big thumbs up 👍🏼.
jay cooper profile picture
jay cooper
3 years ago
Quality company, would definitely recommend 👍🏻
Very efficient and professional service would highly recommend also have friendly courteous staff
Steven Wrigley profile picture
Steven Wrigley
3 years ago
SRS were easy to deal with, with promp replies to my emails and easy to arrange for the job to be done while I wasn't at home. They removed some asbestos floor tiles for us and did so leaving no mess behind by the time I ruturned home. Overall very pleased witht the service.
Tessa Withall profile picture
Tessa Withall
3 years ago
The guys who turned up today did a fantastic job. They were punctual, very accommodating, worked so well and talked me through everything they had done and detailed where they have cleaned. They were honestly fantastic. Highly recommended. From someone who has worked in their industry aswell so I was mightily impressed. I also spoke to others through the company who also were fantastic and very professional. Highly recommended
Richard Abbott profile picture
Richard Abbott
4 years ago
We had SRS attend a recent job where we had discovered what appeared to be asbestos. They were prompt to attend and having established that is was indeed asbestos, arranged a very swift removal at a cost which was not at all unreasonable.