The asbestos removal specialists at Specialist Remediation Solutions Ltd (SRS) have more than six decades of combined industry experience.
Our specialist teams are appropriately trained and experienced in asbestos removal, ensuring works are carefully planned and undertaken using suitable control measures to minimise the potential for exposure and fibre release.
Effective control measures, appropriate PPE and RPE, specialist equipment and thorough planning are fundamental to every asbestos removal project we undertake.
How do SRS manage asbestos removal safely?
The process normally begins with a site visit, where a member of the SRS team meets with the client, Contracts Manager or Site Supervisor to assess the proposed works and understand the site requirements.
Once our quotation has been accepted, we undertake a pre-start site assessment. This allows us to obtain accurate measurements, review access and site conditions, assess the asbestos-containing materials and gather the information required to prepare the project-specific documentation.
We then prepare the Risk Assessments, Plan of Work and associated site documentation, detailing how the asbestos works will be undertaken and the control measures required to protect our operatives and others who may be affected by the works.
Where the works are notifiable licensed asbestos work, SRS will submit the required notification to the Health and Safety Executive (HSE) before the works commence, normally allowing for the required 14-day notification period.
For licensed removal works requiring an enclosure, our specialist team will construct a suitable enclosure around the work area. Depending on the building and site conditions, this may utilise the existing structure or be constructed using suitable framing and heavy-duty polythene.
The enclosure is then placed under negative pressure using appropriately sized Negative Pressure Units (NPUs), helping to prevent asbestos fibres from escaping from the controlled work area.
Throughout the removal process, our operatives wear appropriate PPE and face-fit-tested RPE, which may include full-face or half-mask respirators depending on the work being undertaken. Specialist equipment including Class H vacuum cleaners, NPUs and Decontamination Units (DCUs) is used as required.
Asbestos-containing materials are carefully removed using techniques designed to keep fibre release as low as reasonably practicable. The work area is progressively cleaned throughout the removal process and thoroughly cleaned on completion.
Asbestos waste is appropriately contained, sealed and labelled before being transferred to secure waste storage. Smaller quantities may be transferred to the designated sealed asbestos waste compartment/container on an SRS vehicle, while larger quantities may be placed directly into suitable enclosed skips.
All asbestos waste is subsequently transported and disposed of through appropriately authorised waste facilities in accordance with the applicable hazardous-waste requirements.
For licensed enclosure works requiring clearance, an independent UKAS-accredited analyst carries out the required clearance procedure on completion. Once all stages have been satisfactorily completed, a Certificate of Reoccupation is issued before the area is returned to normal use.
If you want some information or assistance in how to manage asbestos removal safely, call us today on 01536 860166.